Topsides Engineering & Modifications
Topsides - Engineering & Modifications Lead Planning Engineer supplied specifically to develop and maintain a detailed Project Programme integrated with the Project Cost Control model for the Texaco Captain WPP’A’ Brown Field Modifications in preparation for the installation and Hook-up of a new Bridge Linked Platform(BLP) at WPP’A’. This involved the production of a detailed Level 3 Plan supported by design CTRs, deliverable schedules and Job Cards for the implementation phase.
During the development of the plan various scenarios where explored to make best use of available offshore beds while still retaining a productive & achievable engineering programme. All project reporting and progress measurement was at deliverable and Job Card level which was rolled up to the control network for weekly reporting and integrated into the overall Texaco Expansion Project schedule for monthly reporting.
Topsides - Engineering Modifications Lead Planning Engineer supplied specifically for the Detail Design Planning and Project Control of the Shell Expro Brent Field ESD Valves Relocation Project. Liaising with construction to eliminate clashes during offshore installation within planned platform shutdowns.
Topsides - Engineering & Modifications Lead Planning Engineer supplied specifically to develop and maintain a detailed Project Programme integrated with the Project Cost Control model for the Texaco Captain WPP’A’ Brown Field Modifications in preparation for the installation and Hook-up of a new Bridge Linked Platform(BLP) at WPP’A’. This involved the production of a detailed Level 3 Plan supported by design CTRs, deliverable schedules and Job Cards for the implementation phase.
During the development of the plan various scenarios where explored to make best use of available offshore beds while still retaining a productive & achievable engineering programme. All project reporting and progress measurement was at deliverable and Job Card level which was rolled up to the control network for weekly reporting and integrated into the overall Texaco Expansion Project schedule for monthly reporting.
Topsides - Engineering Modifications Lead Planning Engineer supplied specifically for the Detail Design Planning and Project Control of the Shell Expro Brent Field ESD Valves Relocation Project. Liaising with construction to eliminate clashes during offshore installation within planned platform shutdowns.